About the Project

Stage 2 of the McDonald park Master Plan identified upgrades to the sports facilities, so we are upgrading 2 of the Netball courts on the western side of the park to hard surface courts.

This project is scheduled to take place within our 2022/23 Operational Plan and proposed upgrades include:

  • Construction of two hard surface netball courts
  • Lighting
  • Connection footpaths and seating
  • Drainage

Due to the needs of the site and some drainage concerns, there has been some change to the original master plan. The two hard surface courts are set to be constructed on the southwest corner of the park rather than further north. This will make for a more manageable result, that lasts longer and will see more use in most weather conditions. Use the slider below to see the change.

Share your feedback on this stage of the master plan by scrolling down!

What we are doing: What we are doing courts on the south West corner What was in the Master Plan: What was in the Master Plan courts in the North West corner

Key for what we are proposing: 1. Hard surface netball courts (2). 2. Grass surface netball courts (2). 4. Footpaths